DUBAI WORLD CENTRAL RESIDENTIAL DISTRICT
INFRASTRUCTURE CONSTRUCTION PACKAGE CP02 & CP03

SCOPE: The Scope of work includesstress analysis and surge analysis ofpipe works using a validated pipe stress analysis software such as CEASAR II& AFT respectively. Thedesign or routing of the piping system shall consider different conditionsexpected during operation such as dry-out, start up, shut down, cold branch etc. Whenthe routing of the piping system does not inherently provide adequate flexibility, theneeded flexibility must be designed and provided by additional bends, offsets orexpansion joints. The Contractor shall also identify the location and design of anchor orthrust block for the chilled water network.