DUBAI WORLD CENTRAL RESIDENTIAL DISTRICT
INFRASTRUCTURE CONSTRUCTION PACKAGE CP02 & CP03
SCOPE: The Scope of work includesstress analysis and surge
analysis ofpipe works using a validated
pipe stress analysis software such as CEASAR II&
AFT respectively. Thedesign or routing of the piping
system shall consider different conditionsexpected
during operation such as dry-out, start up, shut
down, cold branch etc. Whenthe routing of
the piping system does not inherently provide
adequate flexibility, theneeded flexibility must be
designed and provided by additional bends, offsets
orexpansion joints. The Contractor shall also identify
the location and design of anchor orthrust block for
the chilled water network.