AL WAKRAH STADIUM
SCOPE: The scope of work comprises the stress analysis of chilled water piping network in Al Wakrah Stadium in Qatar. The pipe material shall be Carbon Steel with HDPE Jacketing. The Scope of work includesstress analysis and surge analysis ofpipe works using a validated pipe stress analysis software such as CEASAR II& AFT respectively. Thedesign or routing of the piping system shall consider different conditionsexpected during operation such as dry-out, start up, shut down, cold branch etc.