SCOPE: Pipe stress analysis was carried out for water supply piping network ofOffice Tower C1
Project. The scope of work comprises the stress analysis ofchilled water piping network in ETS Room.
DELIVERABLES
Input considered for the study
Summary of Output results
Assumptions (if any)
Conclusion and recommendations
3D model representation of the Piping system
Input & Output details generated from Caesar II Software